Kwsa Murus Kineticus by Leva Engineering

Kwsa Murus Kineticus by Leva Engineering is a highly esteemed winner of the very prestigious 2025 Praemium A' Design Award Argenteum in Installatio Competition Category.


ArgentumInstallatio· 2025

Kwsa Murus Kineticus

by Leva Engineering

Client: Leva Engineering

Praemium A' Design Award Argenteum Winner in Installatio Category

Colors

Email this page

The Design

About Kwsa Murus Kineticus

Kwsa est installatio muri kinetici in Centro Innovationis Aramco Riyadhi sita. Opus 209 metra quadrata operit et sex muris modularibus formatur, quorum quisque 6000 mm latus et 7000 mm altus est. Motus a 20.000 motoribus gradariis efficitur, qui systema proprium cochleae ductricis et vectis cum praecisione 0,1 mm agunt. Partes ex technopolymeris sese lubricantibus factae lubricatione non egent et accessum a fronte ad curationem praebent. Series motuum choreographicae ex pellicula colorum cinereorum creantur, ubi valores claritatis gradum motus definiunt.

The Recognition

About the Praemium A' Design Award Argenteum

Kwsa Murus Kineticus victor est Praemii A' Design Award Argenteum, honoris eximie amplissimi formis summi generis, pulchris et conspicuis dati. Victores Argenti opera valde splendida et creandi ingenio praedita sunt, quae praestantem peritiam, talentum et acumen auctorum suorum ostendunt. Exspectatur Kwsa Murus Kineticus opus mirabile, exemplare, valde professionale et penitus novum fore. Haec forma Argento victa inventum notabile et admiratum est, quod ad fines artis, scientiae, formandi rationis et technologiae promovendos confert. Kwsa Murus Kineticus creatio est, quam multi invident, quae cupiditates excitat, sensus bonos affert et admirationem miraculumque movet.

Behind the Design

Press Kit

Credits, team members and technical details provided by the designer.

Unique Properties
Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
Dimensions & Packaging
Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required.
Tags
Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
Production Technology
The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
Design Challenge
A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
Research
This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
Inspiration
The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
Project Duration
The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024.
Operation Flow
The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
Team Members
Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology

Sponsored

Explore Beyond Designers.org

Discover products, services and opportunities from our advertising partners.

Good Design Deserves Great Recognition

Nominate Your Work for the A' Design Award.

Nominate