Id-disinn Kwsa Ħajt Kinetiku minn Leva Engineering huwa rebbieħ stmat ħafna tal-prestiġjuż 2025 Premju A' Design Award tal-Fidda fil-Kategorija tal-Kompetizzjoni ta' Disinn ta' Installazzjonijiet.
FiddaInstallazzjoni· 2025
Kwsa Ħajt Kinetiku
minn Leva Engineering
Klijent: Leva Engineering
Rebbieħ tal-Premju A' Design Award tal-Fidda fil-Kategorija ta' Installazzjoni
Rebbieħ ta' Premju Ivverifikat
Ivverifika l-Istatus tal-Premju għal #172468Id-Disinn
Dwar Kwsa Ħajt Kinetiku
Kwsa hija installazzjoni ta' ħajt kinetiku li tinsab fiċ-Ċentru tal-Innovazzjoni ta' Aramco f'Riyadh. Ix-xogħol ikopri 209 metri kwadri u huwa ffurmat minn sitt ħitan modulari, kull wieħed b'wisa' ta' 6000 mm u għoli ta' 7000 mm. Il-moviment jiġi prodott minn 20,000 mutur stepper li jħaddmu sistema apposta ta' vit tal-mexx u lieva bi preċiżjoni ta' 0.1 mm. Il-komponenti magħmula minn teknopolimeri awtolubrifikanti ma jeħtieġu l-ebda lubrifikazzjoni u jippermettu aċċess minn quddiem għall-manutenzjoni. Is-sekwenzi koreografati jinħolqu minn vidjo bi skala tal-griż, fejn il-valuri tal-luminożità jiddefinixxu l-grad tal-moviment.
Ir-Rikonoxximent
Dwar il-Premju A' Design Award tal-Fidda
Kwsa Ħajt Kinetiku huwa rebbieħ tal-Premju A' Design Award tal-Fidda, rikonoxximent prestiġjuż straordinarjament mogħti lil disinji tal-ogħla livell, sbieħ u impressjonanti. Ir-rebbieħa tal-Fidda huma xogħlijiet brillanti ħafna u kreattivi ħafna li juru l-għarfien espert, it-talent u l-aċċuratezza tad-disinjaturi tagħhom. Huwa mistenni li Kwsa Ħajt Kinetiku ikun xogħol mill-isbaħ, eżemplari, professjonali ħafna u innovattiv bil-fond. Dan id-disinn rebbieħ tal-Fidda huwa invenzjoni notevoli u mammirata li tikkontribwixxi biex jitwessgħu l-fruntieri tal-arti, ix-xjenza, id-disinn u t-teknoloġija. Kwsa Ħajt Kinetiku huwa ħolqien li ħafna jinvidjawh, li jqajjem ix-xewqat, iġib sentimenti pożittivi u joħloq tgħaġġib u mistagħġib.
Wara d-Disinn
Kit għall-Istampa
Krediti, membri tat-tim u dettalji tekniċi pprovduti mid-disinjatur.
- Proprjetajiet Uniċi
- Kwsa is a 209 square meter kinetic installation located at the Aramco Innovation Center in Riyadh. It is the largest kinetic wall ever built. The system enables fluid, choreographed movement powered by discreet technology. Engineered for long-term reliability and aesthetic simplicity, the wall integrates seamlessly into its environment and contributes to the spatial narrative without drawing attention to its underlying mechanism.
- Dimensjonijiet u Ippakkjar
- Total surface: 209 square meters.
Configuration: 6 modular walls, each W 6000 mm x H 7000 mm.
Actuation system: 20,000 stepper motors, custom lead screw and lever mechanism.
Precision: 0.1 mm.
Motor update rate: every 20 ms via custom full-duplex protocol.
Control boards: cross-shaped PCBs embedded in chassis.
Maintenance: front access, no lubrication required. - Tikketti
- Kinetic wall, Mechatronic installation, Interactive architecture, Smart facade, Precision engineering, Hidden technology, Architectural motion, Media art
- Teknoloġija tal-Produzzjoni
- The installation features a custom lever-based motion system powered by high-helix lead screws and 20,000 stepper motors. Motion is controlled by cross-shaped PCBs integrated in the chassis. Components are made of self-lubricating technopolymers. Production involved advanced CAD simulation, CNC machining, precision adhesive bonding tools, and an automated QA pipeline for centesimal repeatability.
- Sfida tad-Disinn
- A key challenge was ensuring sub-millimeter precision across six modular walls while maintaining silent, front-accessible operation. Custom electronics, motion systems, and mounting structures had to be developed under tight deadlines and Oil & Gas safety standards. Additional complexity came from the need to coordinate with other installations in the space, requiring both mechanical and digital integration from early design stages.
- Riċerka
- This applied research aimed to develop a precise and low-maintenance kinetic system for architectural use. The team used CAD simulations, structural analysis, CNC machining, and real-time testing to refine the mechanism. The outcome included a self-lubricating motion system and a control protocol managing 20,000 motors. The result supports scalable, synchronized motion for integration in complex multimedia environments.
- Ispirazzjoni
- The design was inspired by the need to create a dynamic architectural feature that integrates naturally with other interactive installations. The objective was to automate motion with high precision while keeping all technology hidden. Every technical decision—from motion control to structural layout—was aimed at achieving visual clarity, acoustic silence, and seamless synchronization within the larger experience.
- Tul tal-Proġett
- The project lasted a total of approximately 12 months:
5 months of prototyping, engineering and testing, 2 months on-site setup, 1 month of tuning. Deployment in 2024. - Fluss tal-Operazzjoni
- The wall performs choreographed movements that follow pre-programmed sequences, timed with other media in the space. Designers create these sequences using grayscale video inputs, where brightness values determine the degree of motion. A custom 3D simulation tool allows teams to preview and adjust movement in real time, helping to translate visual ideas into physical motion with clarity and control.
- Membri tat-Tim
- Leva Engineering CEO: Matteo Mosca
Leva Engineering CTO: Gabriele Gambotto
Contractor: Nesma
Engineering Consultant: Dar Al-Handasah
Concept, Design & Media Production: Tamschick Media+Space
System Integrator: Creative Technology
Sponsorjat
Esplora Lil Hinn minn Designers.org
Skopri prodotti, servizzi u opportunitajiet mis-sħab tar-reklamar tagħna.
Aktar x'Tesplora
Disinni Relatati
Esplora aktar disinni rebbieħa mill-istess kategorija, magħżula skont il-mertu.