设计师 Ying Bi and Siyu Bai 的作品 Factory City To Education City 主要功能:多功能剧场 荣获了极具声望的 2026 A' Design Award 铜奖,竞赛类别为建筑与结构设计。
铜建筑· 2026
Factory City To Education City 主要功能:多功能剧场
设计师: Ying Bi and Siyu Bai
建筑类别A' Design Award 铜奖获奖者
已验证的获奖者
验证 #182316 的获奖状态设计作品
关于 Factory City To Education City 主要功能:多功能剧场
本项目将伊夫雷亚的工业遗产重新构想为一座当代教育与文化园区。通过对现有混凝土结构的适应性再利用,并植入全新的模块化钢结构建筑,设计将昔日的生产环境转变为一个集学习、演出与公共生活于一体的互联框架。剧场、多功能空间以及开放的交通主轴线共同营造出一片灵活的市民景观,使工业记忆演化为充满生机的知识建筑。
荣誉认可
关于A' Design Award 铜奖
Factory City To Education City 主要功能:多功能剧场是 A' Design Award 铜奖得主,这是授予以创造力、独创性和敏锐见长的杰出设计的极具声望的认可。铜奖得主是技艺娴熟、创意惊人的作品,印证了其设计师丰富的经验、想象力与机智。预计Factory City To Education City 主要功能:多功能剧场将成为一件备受推崇、令人钦佩且被珍爱的物品,兼具显著的专业性与创新性。这件赢得 A' Design Award 铜奖的设计融入艺术、科学、设计和技术领域的最佳实践,并因注重细节而出类拔萃。Factory City To Education City 主要功能:多功能剧场出色地满足需求,触动渴望,迷住情感,并吸引好奇心。
设计幕后
媒体资料包
由设计师提供的致谢、团队成员及技术详情。
- 独特属性
- The project transforms an industrial social-services complex into a modular educational campus. Existing concrete buildings are reactivated through light interventions, while new steel structures house a theatre and multifunctional spaces. A connecting public spine integrates learning, culture, landscape, and civic life, turning industrial heritage into a flexible framework for knowledge production.
- 尺寸与包装
- Approximate site area: 8,000 sq.m. The project consists of a theatre volume and a multifunctional educational building connected by semi open circulation. The theatre is approximately 15 m x 23 m x 16 m, using a long span steel roof structure. The multifunctional building is organized on three levels with modular structural bays. Main materials include existing reinforced concrete, steel framing, metal roof decking, insulation, waterproofing membrane, glazing, and perforated metal cladding.
- 标签
- adaptive reuse, industrial heritage, educational campus, modular steel structure, theatre design, multifunctional building, public space, civic architecture, Olivetti, Ivrea
- 生产技术
- The project is realized through a hybrid system of adaptive reuse and lightweight steel construction. Existing concrete structures are preserved and reactivated with minimal intervention, while new volumes use a modular steel frame, long span roof trusses, metal roof decking, insulated build-up roofing, and perforated metal cladding. The theatre integrates acoustic wall lining, suspended acoustic reflectors, lighting grids, sprinkler coordination, and mechanical ducts within a clear structural logic.
- 设计挑战
- The main challenge was to transform a historically industrial site into a contemporary educational and cultural campus without losing its original spatial identity. The design had to balance preservation and intervention, integrating existing concrete structures with new modular steel construction. Another key challenge was to create a clear relationship between theatre, learning spaces, and public circulation while maintaining flexibility, technical performance, and a strong civic character.
- 研究
- The research investigates how industrial heritage can be transformed into a contemporary educational environment. It combines site analysis, historical study of Ivrea and the Olivetti legacy, program development, and architectural prototyping. The project studies adaptive reuse, modular steel construction, and spatial connectivity as strategies to integrate learning, performance, and public life within an existing industrial fabric.
- 灵感
- The project is inspired by Ivrea's industrial legacy and the social vision of the Olivetti factory city. Rather than preserving the site as a static monument, the design explores how industrial structures can support contemporary education, culture, and public life. It draws from adaptive reuse, modular construction, and the transformation of production into knowledge.
- 项目周期
- The project was developed in 2026 as an architectural competition proposal for the Olivetti Theatre site in Ivrea, Italy. It explores the transformation of the former industrial context into a contemporary educational and cultural campus through adaptive reuse, modular construction, and public space integration.
- 操作流程
- The project operates as a connected campus where learning, performance, and public life are brought together through a clear spatial sequence. Visitors move through open pathways, landscape platforms, and shared gathering spaces that link the existing buildings with the new theatre and multifunctional programs. This flow encourages informal interaction, flexible use, and a continuous relationship between education, culture, and civic activity.
- 专利
- Copyrights belong to Siyu Bai, Ying Bi, 2026.
- 团队成员
- Ying Bi, Siyu Bai
- 图片版权
- Ying Bi, Siyu Bai
赞助内容
探索 Designers.org 之外
发现来自我们广告合作伙伴的产品、服务和机会。
探索更多
相关设计
探索同类别中更多按优秀程度甄选的获奖设计。